Dispatch: (972) 316-0148

Current Projects

Bridge Decks

Drilled Piers

Columns

Sloped Paving

Past Projects

Margaret Hunt Hill Bridge

VISTA RIDGE was called in to make to most crucial pour of the (world-renowned architect) Santiago Calatrava-designed bridge over the Trinity River in Dallas, Texas. VISTA RIDGE was able to make the 940 yard pour effortlessly by placing two 61M Schwing Boom Pumps on each side of the Trinity River. Just one more example of having the right equipment to get the job done!

The DART Rail "Green Line"

G.C. Archer Western-Herzog along with Sub-contractor Omega Contracting, Inc. utilized various sized concrete pumps from 32M thru 61M from VISTA RIDGE for the Dallas Rapid Transit Green Line.  This 28 mile $1.8 billion project consisted of over 17 miles of elevated dual track bridges from Dallas to it's northern suburbs.

Lake Lewisville Toll Bridge

VISTA RIDGE provided general contractor Jensen Construction a 61M &/or 52M along with a 40' Mini-Placer for this 1.75 mile $125 Million Toll Bridge over Lake Lewisville.  All deck pours were made in a "leap-Frog' method in which the pump and ready-mix trucks were set-up on decks poured 10 days prior.

Residential

Volume Home Builders have counted on VISTA RIDGE for their concrete pumping needs for over 15 years.  VISTA RIDGE takes pride in keeping residential streets safe and jobsites as clean as they were before we arrive to pour a house foundation.  Custom builders appreciate the availability of the larger size booms for their mansion projects like this one using a 61M (above) .